Project Details - Nyati Hostel
Nyati Hostel
Toilets, balcony, terrace and podium waterproofing work.
Timeline
2 Years
Total Area
54,000 Sqft
Budget
10 Million INR
Buildings
Three (A, B, C)
Project Execution
Honeycombing Treatment:
- Remove loose concrete using hacking hammer.
- Clean surface thoroughly.
- Apply bond coat using Dr. Fixit Pidicrete URP mixed with cement (1:1.5 ratio).
- While tacky, repair honeycombing using polymer modified mortar (URP + cement + sand in 1:5:15 ratio).
Waterproofing Application (Dr. Fixit Fastflex 2K):
- Apply in two coats.
- Pre-wet surface and bring to touch dry condition.
- Apply first coat using nylon brush and fill all undulations.
- Apply second coat perpendicular to first.
- Before drying, spread fine sand over the surface.
Key Achievements
Innovative Solutions
Using advanced waterproofing techniques and premium materials (Dr. Fixit) to ensure long-term, flawless protection.
Safety Excellence
Adhering to strict safety standards to protect our workers and your property during all execution phases.
Steady Progress
Maintaining a disciplined project timeline to meet the expected completion date while preserving impeccable quality.
Project Specifications
Building Type
Residential
Construction Method
Reinforced Concrete
Project Scope
Toilets, Balcony, Terrace, Podium
Buildings Count
3 (A, B, C)
Waterproofing
Dr. Fixit Fastflex 2K
Start Date
26-08-2024
Expected Completion
01-01-2027
Project Progress
50%
Technical Documentation
Comprehensive visual documentation of construction phases and technical implementations
Crack Opening Analysis
Pre Pond Waterproofing Test
Post Pond Final Verification